The average cost to hire an electrician to install or repair light fixtures outlets switches or fans ranges from 141 to 419 with homeowners spending 280 on average.
Meter pole installation cost.
The average cost of an overhead installation is 1 200 including labor materials connecting the wire from the transformer to the weatherhead meter 1 installation and inspection of site location and pole.
For larger electrical jobs like installing wiring or replacing an electrical panel expect to pay 2 000 to 6 000.
Then you have to pull a permit 60 get a licensed electrician to install it 100 and have it signed off by a city county inspector.
A licensed electrician should install the wiring between the meter pole and the building.
See below for our assembly guide for meter pole installation.
If you are a home builder.
If you are a multi unit apartment builder.
Electrical work repair costs.
If this is for electric meter set it is not necessary if the main breakers are off.
The square d 125 amp 16 space 24 circuit outdoor the square d 125 amp 16 space 24 circuit outdoor combination meter socket and main breaker load center is suitable for use as a combination service entrance device csed.
2 unit costs include costs to procure materials installation engineering project management costs for majority of scenarios 3 unit costs exclude generator s responsibility for income tax component of contribution itcc will be added to total cost estimates if required 4 unit costs exclude environmental monitoring and mitigations.
Call centerpoint energy at 713 207 2222 to have an electric service identifier esi id number created.
The combination service entrance device features a ring type meter cover with a single phase 4 jaw meter.
1 4x6 post braced with 2x4s with at least 12ft to knob a 16 ft post.
1 1 1.
If you are a homeowner.
Contact our customer service department here or call 1 800 342 6978 for additional details.
All permits required to receive service are the responsibility of the member.
This unit is ansi certified and ul listed with a maximum 10 000 air.
The average cost of an underground installation is 800 including materials meter 1 installation and connecting service to the splice box.
Get free estimates from electricians near you or check out our pricing guide.
If metallic weather head is used with pvc conduit it must have a bonding ground.
The pole must be treated and be at least a class 7 round or 6 x 6 square and have a minimum of 14 5 feet above the ground.
How deep does the trench have to be.
Submit your request for an esi id nu mber here.
Weather head must be a minimum of 18 inches from top of the pole.